Cisco Systems RF Gateway 10 Guia de Início Rápido Página 24

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 23
24
Figure 17 Aligning the UCH with the RF switch card Dense Connector Ports
Figure 18 Installing the UCH on the Faceplate
Step 5 Repeat steps 1 through 4 for the remaining 11 UCH to RF switch card interconnects.
Note The RF switch cards connect orthogonally across all Universal RF line cards in the system picking up one connector off
each card. It is required to install all the 12 UCH to all the 12 RF switch cards so that the coaxial cables can be
connected even if only one RF line card is installed in the system.
Installing or Replacing the Cables in the UCH2
This section describes how to install and replace the UCH2 cables. The UCH2 universal cable holders must be used with the
Cisco RFGW-10 RF switch line cards. The UCH is designed to stabilize the cables and hold them in place.
273863
Cutout
Red line
Lead screw
Shroud
273864
Vista de página 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 39 40

Comentários a estes Manuais

Sem comentários