Cisco Systems XR 12410 Manual de Instalação Página 104

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 103
Chapter 3 Installing the Cisco XR 12410 Router
Reinstalling Components After Installing the Chassis
3-28
Cisco XR 12410 Router Installation Guide
OL-13832-01
Reinstalling AC PEMs
Use the following procedure to reinstall the AC PEMs back into the chassis.
Step 1 Install the AC PEMs (Figure 3-20):
a. Slide the power supply into the bay until it mates with its backplane
connector.
b. Lift the ejector lever into place and tighten the captive screw to securely seat
the power supply to the backplane connector.
Caution To prevent damage to the power shelf backplane connector, do not use excessive
force when inserting the power supply into the chassis.
Figure 3-20 Installing an AC PEM
Step 2 Repeat Step 1 for the other power supply.
Step 3 Go to the “Reinstalling the Blower Module” section on page 3-30 to install the
blower module.
93228
0
PWR OK
FAULT
TEMP
ILIM
0
P
WR OK
FAULT
TEMP
ILIM
Vista de página 103
1 2 ... 99 100 101 102 103 104 105 106 107 108 109 ... 229 230

Comentários a estes Manuais

Sem comentários